Cape - Sewer Force Main & Master Lift Stations


Cape - Sewer Force Main & Master Lift Stations

Client

City of Port St. Joe

Project Cost

$7,000,000.00

Description

This project consisted of five (5) new primary sewage pumping stations in series and their force mains (6-inch through 18-inch).  The purpose of this system is to convey sewage from various collection systems (gravity and low-pressure) from Cape San Blas to the City’s wastewater treatment facility. Each of these pumping stations was equipped with diesel engine driven generators and odor control systems. PRI was responsible for all surveying and design and permitting components of the project.

download project pull sheet

Board of Professional Engineers License No. 6155 & Surveying & Mapping Business License No. LB 7137