PROJECT NAME - WindMark Beach, Phase 1
CLIENT – St. Joe Company
DESCRIPTION - Arvida’s first development in Gulf County featured a 110-lot subdivision with sales center and beach club. Roadway design, stormwater, grading plans, potable water, sewer, pedestrian pathways.
COMPLETION DATE – 2002
PROJECT COST - $1,500,000.00
PROJECT NAME - Garrison Plantation
CLIENT – Jay Rish
DESCRIPTION - New 52-Lot Subdivision in Port St. Joe. The project featured roadway, water, sewer and stormwater design.
COMPLETION DATE - 2003
PROJECT COST - $500,000.00
PROJECT NAME - Grammercy Plantation
CLIENT – Grammercy Plantation, L.L. C.
DESCRIPTION - This project consisted of a 400-acre development in Franklin County along U.S. Highway 98 including 162 residential lots, a 16-acre commercial area, and an 80-unit hotel as part of a local development order.
COMPLETION DATE – 2001
PROJECT COST - $900,000.00
PROJECT NAME - Bayview Subdivision
CLIENT – St. Joe Land Company
DESCRIPTION - Extended residential area in Port St. Joe along St. Joe Bay. Surveying, water and sewer design.
COMPLETION DATE – 2002
PROJECT COST - $200,000.00
PROJECT NAME - Water’s Edge Subdivision
CLIENT – Dale Piergiovanni
DESCRIPTION - New subdivision off of C-30A in Gulf County featured forty-five lots, including two gulf front. Roadway, potable water, community septic, stormwater, tennis court, and club house.
COMPLETION DATE – 2002
PROJECT COST - $400,000.00
Other projects include:
Sunset Village Subdivision, Gulf County, Florida
Port St. Joe Commerce Park, Gulf County, Florida

PROJECT NAME – Courthouse Square
CLIENT – Wakulla County Commission
DESCRIPTION – Infrastructure planning, design, permitting and construction phase services for a courthouse parking and infrastructure project including; grading, paving, drainage, underground utilities, and parking.
COMPLETION DATE – 2000
PROJECT COST - $145,000.00
PROJECT NAME - 5-Star Paint & Body
CLIENT – Matt Scoggins
DESCRIPTION - Sitework, Stormwater, Pavement and Landscaping for New Body Shop in Port St. Joe, Florida.
COMPLETION DATE - 2002
PROJECT COST - $500,000.00
PROJECT NAME - Sunset Grill Restaurant
CLIENT – Dewey and Patty Blaylock
DESCRIPTION - New Restaurant in Port St. Joe. Sitework, Stormwater, FDOT Connection.
COMPLETION DATE – 2002
PROJECT COST - $750,000.00
PROJECT NAME - Franklin County Annex
CLIENT – Franklin County
DESCRIPTION - New Courthouse Building, included a civil site design and permitting.
COMPLETION DATE - 2002
PROJECT COST - $1,000,000.00
PROJECT NAME - Home Depot Shopping Center, Panama City, Florida
CLIENT – Greenburg Farrow Architects, Seitz Group, and Circuit City
DESCRIPTION - This project consisted of extensive wetland permitting, site master planning, civil design and permitting of entire complex and construction administration.
COMPLETION DATE – 2002
PROJECT COST - $6,000,000.00
PROJECT NAME - Gulf Coast Community College Gulf/Franklin Center
DESCRIPTION - This project consisted of all civil site work related to the project including permitting and construction administration of the entire school campus.
COMPLETION DATE – 2001
PROJECT COST - $3,000,000.00
CLIENT – Board of Trustees, Gulf Coast Community College
PROJECT NAME - Gulf Coast Community College Amelia Tapper Center for the Arts
DESCRIPTION - This project consisted of all civil site work related to the expansion of the college. The expansion consisted of new parking and additional space for the arts center.
COMPLETION DATE - 2001
PROJECT COST - $1,500,000.00
PROJECT NAME - City Hall Improvements
CLIENT – City of Mexico Beach
DESCRIPTION - Expansion of old City Hall parking lot for increased parking and improved traffic circulation. Also addressed drainage and pedestrian traffic.
COMPLETION DATE – 2003
PROJECT COST - $100,000.00
PROJECT NAME - Gulf County Health Department
CLIENT – Bay Design
DESCRIPTION - New health department facility located in Port St. Joe. Roadway and parking, stormwater, site work and utilities.
COMPLETION DATE – 2001
PROJECT COST - $1,200,000.00
PROJECT NAME – Walton County Town Center
CLIENT – Walton County
DESCRIPTION – PRI was responsible for the design and permitting of all utilities, roads, bridges, and bike paths.
COMPLETION DATE – 2003
CLIENT – St. Joe Commercial
PROJECT NAME - Port St. Joe Commerce Park
DESCRIPTION - Port St. Joe’s first commerce park was conceived, designed, permitted and constructed in one calendar year. Project featured roadway, water, sewer stormwater, and dredge and fill.
COMPLETION DATE – 2002
PROJECT COST - $500,000.00
PROJECT NAME – Granite Plus
CLIENT – Wayne Middleton
DESCRIPTION – Project included site civil design and permitting on Panama City Beach.
COMPLETION DATE – 2002
PROJECT COST - $300,000.00
Other projects include:
Gulf County Courthouse Improvements, Port St. Joe
Liberty County Clerks Office, Bristol
Port St. Joe Elementary School, Port St. Joe
Wewahitchka High School Weight Training Facility, Wewahitchka
Walton County Town Center, Walton County
Walton County Courthouse Parking Facility, Defuniak Springs
Marquardt Marina Development, Mexico Beach
Tyndall Air Force Base, SEADS Building Expansion, Tyndall Air Force Base
Wall and Harrison Dental Office, Lynn Haven

PROJECT NAME - Downtown Revitalization
CLIENT – City of Port St. Joe
DESCRIPTION - The City secured CDBG funds to improve the streetscape on Reid Avenue. Entire road was demolished including sidewalks. Improvements included decorative lighting, landscaping, irrigation, drainage, and pedestrian walks.
COMPLETION DATE – 1996
PROJECT COST - $650,000.00
PROJECT NAME – CR 279 at Willis Bridge
CLIENT – Calhoun County Commission
DESCRIPTION – Relocate approximately 3000 feet of road in conjunction with the Willis Bridge replacement project, including right-of-way research, horizontal and vertical alignments, super elevation, striping, signage, and erosion control.
COMPLETION DATE: 1996
PROJECT COST - $300,000.00
PROJECT NAME – Calhoun County Road CDBG 2000
CLIENT – Calhoun County Commission
DESCRIPTION – Paving, grading and drainage improvements to seven (7) dirt roads at scattered locations.
COMPLETION DATE – 2000
PROJECT COST - $800,000.00
PROJECT NAME – Opportunity (Industrial) Park – Wakulla County, Florida
CLIENT – N.G. Wade Investments
DESCRIPTION – Approximately 6,800 feet of new roads in conjunction with the Opportunity Park project, including horizontal and vertical alignments, grading and drainage, striping, signage, and erosion control.
COMPLETION DATE – 2001
PROJECT COST - $400,000.00
PROJECT NAME – FEMA Storm Damage Reconstruction
CLIENT – Walton County Commission
DESCRIPTION – Replacement of five (5) bridges or major culverts, destroyed by storms. Each project involved the redesign of the roadway approaches to the bridges, some over one-mile in length. Analysis of drainage basins as large as 4,000 acres were required for the design of new structures. The scope of the work included surveys, geotechnical investigations, roadway design, drainage improvements, permitting and construction/contract administration
COMPLETION DATE – 2002
PROJECT COST - $1,000,000.00
PROJECT NAME – Seascape Pedestrian Tunnel – Old Highway 98, Walton County Florida
CLIENT – Seascape Resorts
DESCRIPTION – A tunnel under U.S. Highway 98 to allow ease of access to the beach without crossing the road.
COMPLETION DATE – 2000
PROJECT COST - $200,000.00
PROJECT NAME – Six (6) separate bridges at different locations.
CLIENT – Gulf County Commission
DESCRIPTION – A variety of bridges including single lane and two lane, length ranging from 30 feet to 60’.
COMPLETION DATE – 2001
PROJECT COST - $150,000.00
PROJECT NAME – Gulf County Road Bond
CLIENT – Gulf County Board of County Commission
DESCRIPTION – Resurfacing and new construction of more than 50 roads throughout Gulf County
COMPLETION DATE – 2003
PROJECT COST - $2,000,000.00
Other road and bridge projects include:
Overstreet Road resurfacing project, Gulf County
U.S. Highway 98 realignment, Gulf County
Over a thousand miles of new construction and resurfacing road projects in Walton, Washington, Gulf, Franklin, Calhoun, Liberty, Gadsden, and Wakulla Counties
SR 71 – FDOT resurfacing project
19th Street Improvements, Panama City

WALTON COUNTY GEOPARK BIKE TRAIL
Client: Walton County Board of County Commissioners
Location of Project: The Walton County Geopark Bike Trail parallels County Road 30A (CR 30A) and Old US 98 in South Walton County.
Brief Description of Project: The Walton County Geopark Bike Trail is 26 miles in length and connects the State Parks of South Walton County, beachfront county parks and the Point Washington Wildlife Management Area into a system to provide for recreation as well as a local transportation alternative. The trail is generally eight [8’] feet wide, constructed of asphalt. Certain areas of privately landscaped areas of the right-of-way, which incorporate a suitable trail [e.g., Seaside], are incorporated into the system.
Project Cost: $1,500,000.00
Completion Date: 2000
PORT ST. JOE MARINA
Client: City of Port St. Joe
Location of Project: Port St. Joe
Brief Description of Project: This project consisted of the design and construction of a Gulf of Mexico accessed municipal marina for 120 wet slips, 100 dry slips and dry storage. The facility provides a fueling facility, rest rooms and showers and a ship’s store.
Project Cost: $3,500,000.00
Completion Date: 2000
OTHER PARKS, BOAT RAMPS AND MARINAS:
North Caicos Marina, Turks and Caicos Islands, B.W.I.
Port St. Joe Marina, Port St. Joe
Port St. Joe Elementary School Playground, Port St. Joe
Liberty County Boat Ramp
Indian Pass Boat Ramp, Gulf County
Bob George Park, Panama City (Dredging/Boat Ramp/Parking/Landscaping)
Pier Park, Mexico Beach
Beacon Hill Park, Gulf County
Cape Palms Park, Gulf County
T.L. James Park, Wewahitchka
Maddox Park, Port St. Joe
Frank Pate Park, Port St. Joe
Sunset Park, Mexico Beach
Parker Sports Complex, Parker
Gulf County Sports Complex, Gulf County
South Gulf County Bike Path
Forest Park Sports Complex, Port St. Joe
Wee Care Children’s Park, Defuniak Springs

PROJECT NAME – FEMA Storm Damage Reconstruction
CLIENT – Walton County Commission
DESCRIPTION – This project refers to the analysis of drainage basins as large as 4,000 acres. When major bridges and other drainage structures were literally destroyed, the first task was to analyze the drainage basin that the structure served. In every case it was found that the structures were not adequate for stormwater management and had ultimately failed.
PROJECT NAME – Governors Square Mall Pond Monitoring
CLIENT – Governors Square Mall
DESCRIPTION – Set up and maintain a system to monitor storm water discharge from the Mall’s storm water pond.
PROJECT NAME – Downtown CDBG
CLIENT – City of Blountstown
DESCRIPTION – Various flood prevention and storm water treatment projects for the City of Blountstown’s 1992 CDBG program.
COMPLETION DATE – 1992
PROJECT COST - $500,000.00
SOLID WASTE
Bay County Steel Field Landfill
Calhoun County Landfill
Gulf County Landfill
Liberty County Landfill
Walton County Landfill
WATER SYSTEM
SR 79 WATER STORAGE AND PUMPING FACILITY (23 MGD PLANT)
Client: City of Panama City Beach
Location of Project: The plant is located at the intersection of SR 79 and School Road in West Bay.
Project Cost: $5.0 million
Completion Date: 2002
Brief Description of Project: The project consists of 2 – 7 million gallon ground storage tanks, 7 – 2,650 gpm (150 hp) high service pumps with variable frequency drives and a sodium hypochlorite system for disinfection. The total pumping capacity of the plant is 23 MG per day. PRI was also responsible for performing a hydraulic model of the entire City’s system and are responsible for updating the system as customers are added. Panama City Beach currently serves approximately 45,000 residents. This project allowed 13 potable water wells to be taken off line from the Floridan Aquifer.
LAKE MYSTIC WATER SYSTEM
Client: Liberty County Board of County Commissioners
Location of Project: Lake Mystic, Liberty County
Project Cost: $1.5 million
Completion Date: 2000
Brief Description of Project: This project consisted of 2 – 250 gpm (20 hp) potable water wells, 80,000 gallon ground storage tank, 2 – 500 gpm (25 hp) high service pumps, a 5,000 gallon hydropnuematic tank, a gas chlorination system for disinfection, and approximately 80,000 LF of 4” to 10” water mains. This system currently serves approximately 200 customers.
ST. JOSEPH PENINSULA BOOSTER STATION
Client: Lighthouse Utilities, Inc. (LUCI)
Location of Project: Gulf County
Project Cost: $0.4 million
Completion Date: 2002
Brief Description of Project: This project consisted of a 209,000 gallon ground storage tank, 2 – 500 gpm (20 hp) high service pumps and a 10,000 gallon hydropneumatic tank. The LUCI System currently serves approximately 890 customers.
SOUTHPORT WATER SYSTEM
Client: Gulf Coast Electric Cooperative
Location of Project: Bay County
Project Cost: $5.5 million
Completion Date: 2003
Brief Description of Project: This project consisted of a 341,000 gallon ground storage tank, 4 – 650 (30 hp) high service pumps with variable frequency drives, a gas chlorination system for disinfection and over 75 miles of 4” to 16” water mains. This system currently serves approximately 1,800 customers.
Note: This project was funded in two phases by USDA – Rural Development who required a preliminary engineering report. The preliminary engineering report is extensive and covers everything from project cost, feasibility, alternatives, operation and maintenance and loan pay back analysis. The system was also modeled with Watercadd by PRI.
BAY COUNTY WATER TRANSMISSION MAIN
Client: Bay County Board of County Commissioners
Location of Project: Bay County
Project Cost : $18.0 million (Project was completed under budget)
Completion Date: 2001
Brief Description of Project: This project consisted of approximately 25 miles of 42” and 36” water main with 3 aerial crossings and 2 subaqueous crossings, one through North Bay and the other through the Intracoastal Waterway. This transmission main serves the Panama City Beach – SR 79 Water Booster Pumping and Storage Facility and Southport Water Systems mentioned earlier in this section.
PANAMA CITY BEACH – EAST AND WEST TRANSMISSION MAINS
Client: City of Panama City Beach
Location of Project: Bay County
Project Cost : $3.5 million
Project Schedule: West Transmission Main was finished in March 2002. The East Transmission main should be on-line by April 2003
Brief Description of Project: This project consisted of approximately 3 miles of 20” water main and 5 miles of 24” water main. These two water mains are fed by the new Panama City Beach Booster Station project (first mentioned project in this section) and deliver potable water to the entire City of Panama City Beach.
Gulf County – Highland View Water System
Project Cost: $0.6 million
Completion Date: 2000
Liberty County – Rock Bluff Water System
Project Cost: 2.5 million
Completion Date: 2004
Franklin County – Water Line Extension
Project Cost: 0.5 million
Completion Date: 1998
City of Wewahitchka – Water line Extension
Project Cost: 0.06 million
Completion Date: 1997
Gulf County – Williamsburg Water System
Project Cost: 0.55 million
Completion Date: 1996
Bay County – John Pitts Road Water Line
Project Cost: $0.5 million
Completion Date: 2002
Regional Utilities – Numerous water and sewer projects
Project Cost: $15 million
Completion Date: 2003
City of Wewahitchka – Water and Wastewater Improvements
Project Cost: $4.0 million
Completion Date: 2004
Regional Utilities – Water and Sewer Utility Master Plan
Completion Date: 2003
WASTEWATER SYSTEM
EASTPOINT WATER AND SEWER IMPROVEMENTS
Client: Eastpoint Water and Sewer District
Location of Project: Eastpoint, Florida
Project Cost : $2 million
Completion Date: March, 2003
Brief Description of Project: This project involved water distribution extensions, water plant improvements, sewer collection improvements, and a wastewater treatment plant upgrade from 165,000 gpd to 300,000 gpd.
Bay County – “A” Street Force Main
Project Cost: $0.1 million
Completion Date: 2002
Bay County – Lynn Haven WWTP
Project Cost: $5.0 million
Completion Date: 2003
City of Bristol – Wastewater Treatment Plant and Collection System
Project Cost: $6.0 million
Completion Date: 2004
Gulf County – St. Joe Beach, Highland View, and Beacon Hill Sewer Collection Systems
Project Cost: $15.0 million
Completion Date: 2005
City of Wewahitchka – Wastewater Treatment Plant
Project Cost: $0.6 million
Completion Date: 1995
Regional Utilities – Numerous water and sewer projects
Project Cost: $15 million
Completion Date: 2003
City of Wewahitchka – Water and Wastewater Improvements
Project Cost: $4.0 million
Completion Date: 2004
Regional Utilities – Water and Sewer Utility Master Plan
Completion Date: 2003
City of Lynn Haven’s 2.0 MG Wastewater Treatment Plant
City of Port St. Joe Wastewater Treatment Plant Improvements |